Blog

Air Vent Design on Spoon & Fork Mould | Cutlery Mould Air Vent

All the cutlery mould need air vent design, include spoon mould and fork mould. Many not profesional mould factory making cutlery moulds without air vent or with wrong air vent design. The mould can be running during mould test, as they can set the injection moulding parameter with high temperature and high injection pressure. By this way, products can be full filling, but the spoon and fork made by this

Spoon mould ready for shipment

Spoon mould is our main products. XS Plastic Mould Co., Ltd have many year experinence in making culter moulds. From spoon design ready till spoon mould finish tooling will take about 20 days. So usually this kind of mould delivery will need about 30days. Above 2 sets spoon mould is ready now. Will deliver to customer shortly.

New spoon mould under developing.

Client placed new spoon mould order. Now the spoon design is ready. Will go on the spoon mould design soon.